Download Print this page

Tiger M6-131 Mounting And Operating Instructions page 108

Hide thumbs Also See for M6-131:

Advertisement

MAINTENANCE
GREASING POINTS ON BOOM AND PIVOT
Locate grease zerks on deck pivot ssembly, on the
deck end of secondary boom, at main/secondary
boom joint, and at swivel end of main boom. Inject
Lithium-Complex
Extreme
Pressure
grease
conforming to NLGI2-ISO 320 specifications until
grease begins to protrude from ends.
DECK STOP ADJUSTMENT
On boom flail, loosen locking nut. Turn adjustment
bolt in, and run deck cylinder out to full extension.
Adjust bolt out until the head just touches the boom,
and tighten lock nut. NOTE: Bolt should not hit
boom before cylinder reaches full travel.
GREASING SPINDLE
Locate grease fitting on inside of deck housing.
Inject
Tiger
Spindle
Lubricant,
part
number
06540000 into spindle housing. Fill with lubricant
until lubricant weeps out of top spindle seal.
Lubricate spindle weekly or every 40 hours of use.
Boom
Maintenance Section 4-14
©2020 Alamo Group Inc.

Advertisement

loading