Dash Port 2 Docking Station Test (Option); Tram-Rac 2A Module Housing Peripheral Device Test (Option); Icg Module Test (Option) - GE Dash 3000 Service Manual

Patient monitor
Hide thumbs Also See for Dash 3000:
Table of Contents

Advertisement

Dash Port 2 docking station test (option)

Electrical safety tests
Operation

TRAM-rac 2A module housing peripheral device test (option)

Electrical safety tests
Operation

ICG Module test (option)

Operation
8-54
Functional and electrical safety checks: Functional Checkout procedures
When the patient monitor is connected to the docking station, perform
the electrical safety tests described in the maintenance section of the
Dash Port 2 Service Manual.
Complete the Checkout procedures located in the Dash Port 2 Docking
Station Service Manual.
Perform the electrical safety tests on the TRAM-rac 2A separate from the
patient monitor.
Refer to the
following tests.
1. Power outlet test
2. Ground (earth) continuity test,
3. Ground (earth) wire leakage tests, and
4. Enclosure leakage current test.
Complete the TRAM-rac 2A Module Housing Test procedures found in
the maintenance section of the TRAM-rac 2A Module Housing Service
Manual.
Refer to the "Electrical safety tests" section of the ICG Module Service
Manual.
Complete the ICG Test found in the Checkout Procedure section of the
ICG Module Service Manual.
Dash 3000/4000/5000
"Electrical safety tests"
on page 8-4 and complete the
2000966-542D

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dash 4000Dash 5000001c 051d 003a

Table of Contents