Overview; Manufacturer Recommendations; Frequency; Test Equipment - GE Dash 3000 Service Manual

Patient monitor
Hide thumbs Also See for Dash 3000:
Table of Contents

Advertisement

Overview

Manufacturer recommendations

Frequency

Test equipment

8-2
Functional and electrical safety checks: Overview
These safety tests and checkout procedures provide service personnel
with a method to verify operational and functional performance of the
patient monitor. Safety and functional checkout tests should be
documented in the Checklist provided in
to attain any of the listed results indicates a potential malfunction of the
patient monitor.
WARNING
The personnel assessing the safety of the patient monitor
shall be able to recognize possible consequences and risks
arising from non-conforming equipment.
The safety tests and checkout procedures are based on the assumption
that the tested patient monitor has known good cables and test
equipment. It also requires qualified personnel who are familiar with the
operation of all test equipment required for the procedures. For more
information concerning the operation of these components, refer to the
respective operator manual(s).
Qualified personnel must perform the checkout procedures:
Every 12 months after receipt of the device (Preventive
Maintenance). Refer to
information.
Each time the main enclosure is disassembled or a circuit board is
removed, tested, or replaced (Corrective Maintenance). Refer to
"Recommended checkout"
The safety tests and checkout procedures are written for the GE
recommended test equipment listed for each test. If you use test
equipment other than those GE recommends, you may need to slightly
modify some test steps.
Dash 3000/4000/5000
"Checklist"
"Maintenance schedule"
on page 7-52 for more information.
on page D-1. Failure
on page 5-2 for more
2000966-542D

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dash 4000Dash 5000001c 051d 003a

Table of Contents