1 About this document
Target group
Installation personnel
Commissioning personnel ●
Operating personnel
Maintenance personnel
A6V10421795_en--_k
●
Specialist electrical engineering knowledge is required for installation.
●
Only an expert is permitted to carry out installation work.
Incorrect installation can take safety devices out of operation unbeknown to a
layperson.
Goal and purpose
The information provided in this manual is a summary of the key procedures and
functions required to assemble, install, operate, commission and maintain the
system.
It is intended to provide experienced and qualified personnel a guide on the
required processes.
Scope
The technical manual applies to fire control panel of FC360 series.
Target groups
The information in this document is intended for the following target groups:
Activity
●
Assembles and installs the product
components at the place of
installation.
●
Carries out a performance check
following installation.
Configure the product at the place of
installation according to customer-
specific requirements.
●
Check the product operability and
release the product for use by the
operator.
●
Searches for and corrects
malfunctions.
●
Carries out procedures to correctly
operate the product.
●
Carries out all maintenance work.
●
Checks that the products are in
perfect working order.
●
Searches for and corrects
malfunctions.
Document identification
The document ID is structured as follows:
A6Vxxxxxxxx_aaAA_vv
A6Vxxxxxxxx_--AA_vv
A6Vxxxxxxxx_aa--_vv
A6Vxxxxxxxx_----_vv
About this document
Applicable documents
Qualification
●
Has received specialist training in
the area of building installation
technology or electrical installations.
●
Has obtained suitable specialist
training for the function and for the
products.
●
Has attended the training courses
for commissioning personnel.
●
No particular basic training is
needed.
●
Has been instructed by the
commissioning personnel.
●
Has obtained suitable specialist
training for the function and for the
products.
1
7 | 151