Download Print this page

Yardistry YM11700 Installation And Operating Instructions Manual page 16

12 x 14 pergola room

Advertisement

Step 4: Attach Panel Posts to Corner Posts
Part 1
Note: Only pre-drill one post per
assembly
A: On (239) Engineered Panel Cor-
ner Post Long, per assembly, pre-drill
two holes from the inside, at the places
shown in fig. 4.1 and 4.2. Pre-drill in the
centre of the panel and on a slight angle.
(241)
Engineered
Fig. 4.1
Panel Post
Long
16
(239)
Engineered
Panel Corner
Post Long
Fig. 4.2
pre-drill 3 holes from the centre
on a slight angle
support@yardistrystructures.com
Pre-drill
on a slight
angle

Advertisement

loading