Download Print this page

Yardistry YM11700 Installation And Operating Instructions Manual page 15

12 x 14 pergola room

Advertisement

Step 3: Assemble 8 Panels
Part 2
D: Slide one complete Insert in from
the top of the panels and down to the
(185) Horizontal Insert. (fig. 3.2)
E: Slide one (185) Horizontal Insert to
the top of the complete Insert. (fig. 3.2)
Attach with two #8 x 3" Wood Screws.
Note: Be sure to maintain 16"
measurement between each (185)
Horizontal Insert. (fig 3.3)
F: Repeat Steps D and E so there are
four complete Inserts per Panel Post
assembly. The last board should be
a (189) Cross Brace Insert. Attach all
three Horizontal Inserts with two #8 x
3" Wood Screws per insert and attach
(189) Cross Brace Insert with four #8 x
3" Wood Screws. (fig. 3.3)
Wood Parts
32 x Completed Inserts from Step 2
8 x (189) Cross Brace Insert 38.1 x 76.2 x 409.6 mm
24 x (185) Horizontal Insert 38.1 x 38.1 x 409.6 mm
Fig. 3.2
(185)
Horizontal
Insert
Complete
Insert
(185)
Horizontal
Insert
(191) Bottom
Brace Insert
Fig. 3.3
(241)
Engineered
Panel Corner
Post Long
#8 x 3"
Wood
Screws x 5
(239)
Engineered
Panel Corner
Post Long
(185)
Horizontal
Insert
80 x #8 x 3" Wood Screw
15
(189) Cross
Brace Insert
#8 x 3"
Wood
Screws x 5
Hardware
support@yardistrystructures.com
16"

Advertisement

loading