Optex AX-100 TFRi Installation Instructions Manual page 6

Battery operated photoelectric detector
Hide thumbs Also See for AX-100 TFRi:
Table of Contents

Advertisement

Fix the chassis and main unit mounting bracket (optional) in
6
the tower.
Main unit mounting bracket
(option: MP-4)
Caution
After mounting the chassis, wiggle the tamper bushing
with your thumb and forefinger to ensure the tamper
works properly.
Refer to sec. "3-1" steps 3 through 4 to install the wireless
7
transmitters and batteries in the back box, and then install the
back box on the chassis.
Install the main unit on the main unit mounting bracket.
After completing the settings and operation check, insert the
8
tamper bushing into each transmitter/receiver.
• The switch selection is not recognized with the
• After completing the settings, be sure to insert the
• Monitor Jack Output become disable when tamper
• When inserting the tamper bushing, the beam
• For UL/c-UL installations tamper switches shall be 
How to remove the tamper bushing >>
Insert a flat-blade screwdriver, and twist it lightly to
remove the tamper bushing.
Tighten the screws.
-6-
Tamper bushing
(option: MP-4)
Caution
tamper bushing inserted.
Remove the tamper bushing before selecting a
function using the switch.
tamper bushing to check that all LEDs are OFF.
Without the tamper busing, the LEDs are kept ON,
which consumes more battery power.
bushing inserted.
alignment test point will be disabled. Please complete
the alignment procedure before inserting tamper
bushing.
enabled.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ax-200 tfri

Table of Contents