Ford Transit
24. Install the control panel (2) using four screws
(33). Connect the control panel connector
and install the map light assembly.
25. Route the power portion of the wiring
harness under the flooring to the battery
compartment.
NOTE: Due to vehicle build variations, the
images in this manual may not be represen-
tative.
26.Replace the bottom 60 amp fuse with the
supplied 50 amp fuse. Reinstall the power
distribution center at this time.
23
Vancouver
Need help?
Do you have a question about the Transit Vancouver Standard and is the answer not in the manual?