CPI COTI Technical Manual page 118

Table of Contents

Advertisement

6.1.5 Key 5 - View Counters
The View Counters or Data Recall button enables the operator to access the Data Recall
Menu. Entry into this menu allows the operator to view Non-Resettable and Resettable
Sales Data, data relating to Timed Events, Identification Numbers of installed components
and (if the feature is enabled) view SureVend™ assisted vend data. The Resettable Sales
Data and SureVend™ Data menus contain an extra sub-menu which allows the operator to
delete the current data from the machines memory. Refer to section 5.3 Data Recall Menu
for full details relating to this menu and its contents.
6.1.6 Key 6 - Test Vend
The Test Vend button enables the operator to vend a drink from the machine to ensure
correct operation after cleaning or maintenance.
Note: For LINEA standard drinks place cup under dispense nozzles before following the
below sequence. If vending hot water, place cup under hot water spout.
1.
Press a drink selection button followed by the START button to begin the vend
sequence.
2.
Ensure that the selection is correct, has not under/overfilled the cup and most
importantly, tastes good!
3.
Press the Up One Page or Cancel key on the drink selection keypad to exit from the
Test menu and return to stand-by mode.
6.1.7 Key 7 - Cup Test
This button enables the operator to test the operation of the cup drop unit after refilling the
cup stacks. When the button is pressed the cup drop motor is operated and a cup is ejected
from the cup drop unit. This function ensures that the mechanism is working correctly.
6.1.8 Key 8 - Park Head
When this button is pressed, the dispense head moves to its fully extended position and
stops. Press the button again to return the dispense head to its home position.
6.1.9 Key 9 - Boiler Fill (Espresso Machines)
When this button is pressed the machine will purge all the water from the pressure water
system by replacing it with fresh water, it will dispense approximately 900ml. This button
should be used to purge any water left in the system after the machine has been moved or
shut down for any length of time or if there is an air lock in the closed loop system i.e. after
an install, a new water filter fitted or the machine has been serviced.
Warning: ensure there is a suitable container in position to catch the water being
dispensed Also be aware this water may be hot.
6.1.10 Key 10 - Machine Cool Down (Espresso Machines)
Machine Cool Down or Boiler Cool Down enables an engineer to work safely on the Espresso
module.
When this button is pressed the hot water in the pressure system is replaced by 500ml of
cold water. When complete, the message "Machine Cooled" is displayed and all outputs will
108

Advertisement

Table of Contents
loading

This manual is also suitable for:

Linea

Table of Contents