.
6
To verify that the new module is operating normally, navigate to the module status screen
("Main screen > Status > Modules"), press on the icon of the module that was just switched on, and
verify that the status is "ON" for these items: PFC, Inverter, Input relay, Output relay. Verify that the
other fields are also normal.
7.
On the same screen ("Status > Modules"), press the Output button, select the replacement module
and verify that the output frequency matches the system nominal value, and that the output voltage of
each phase is within 2 % of the system nominal value.
38
G
E
AMATRONIC
LECTRONIC
Figure 38: Turning on a module
Figure 39: Verifying status of added module
I
L
.
NDUSTRIES
TD
Power + PREMIUM, Installation Guide, rel. 1.7