Installation; Installation Checklist; Table 1: Installation Checklist - Gamatronic POWER+ PREMIUM Installation Manual

Table of Contents

Advertisement

2.
I
NSTALLATION
2.1

Installation checklist

Complete the following checklist as you perform the installation, initialization, configuration, and testing
procedures. Refer to the appropriate sections (specified in the Reference column) for detailed information
about each checklist item.
When the checklist is complete, fax it, along with a connection diagram, to
Gamatronic at +972-2-582-8875.
Power+ model and configuration
Customer
Site
Power+ Premium Model
[ ] Up to 50 kVA [ ] Up to 100 kVA
Serial numbers: System_________________
Modules 1___________ 2___________ 3___________ 4___________ 5___________
6___________ 7___________ 8___________ 9___________ 10___________
Technician Name
Verify the physical integrity of the system
Verify that all components and modules are in
place
Comments on visual inspection: __________________________________________________
_______________________________________________________________________________
_______________________________________________________________________________
Check ambient temperature
Check humidity and condensation
Check ventilation
Check foundation and access
Check for adequate clearances
Comments on site preparation – physical: __________________________________________
_______________________________________________________________________________
_______________________________________________________________________________
Check circuit breakers on electrical boards
supplying the Power+
Check diameter of input and output power
cables connections, GND, and neutral lines
2
G
AMATRONIC

Table 1: Installation checklist

Address
Phone
[ ] 3-3 Config.
[ ] Other (specify)
Date
Operation
V i s u a l I n s p e c t i o n
S i t e P r e p a r a t i o n – P h ys i c a l
S i t e P r e p a r a t i o n – E l e c t r i c a l
E
I
L
LECTRONIC
NDUSTRIES
E-mail
No. of modules _____
No. of redundant modules _____
Static Switch ____________________
Signature
Requirement
No physical damage
Components and modules are
securely fastened to shelves
Recommended range:
+15 ~ +25 °C (+59 ~ +77 ° F)
Min/max:
–10 / +40 °C (+14 / +104 °F)
No condensation/dampness
Proper airflow to batteries
Adequate structure and access
91 cm (36 in.) at rear and
100 cm (39 in.) at front
Meet local code and Gamatronic
recommendations
Meet local code and Gamatronic
recommendations
Power + PREMIUM, Installation Guide, rel. 1.7
.
TD
2.3.1
2.3.1 Step 3
2.3.2 Step 1
2.3.2 Step 2
2.3.2 Step 3
2.3.2 Step 4
2.3.2 Step 5
2.3.3 Step 1
2.3.3 Step 2
Reference

Advertisement

Table of Contents
loading

Table of Contents