System Power Connection (My 2017 & 2018) - Raven Hawkeye 2 Installation Manual

For et apache sprayers my 2017+
Hide thumbs Also See for Hawkeye 2:
Table of Contents

Advertisement

CHAPTER 5
SYSTEM POWER CONNECTION (MY 2017 & 2018)
1. Locate the RCM - Sprayer power cable (P/N 115-2005-008) provided in the kit.
FIGURE 12. Harness Under Electrical Box
Electrical Box
Receptacle
on Harness
2. Locate the large, round connector of the breakaway cable (P/N 115-2005-001) and connect it to the
corresponding connector of the power cable.
3. Open the hood of the sprayer to access the power connections, and route the power cable towards the sprayer
battery compartment.
NOTE:
Follow the right frame rail towards the front of the machine.
4. Locate the Ground Aux. terminals on the power connection.
5. Connect the ground cable from the power cable (115-2005-008) to the ground aux terminal.
6. Connect the power ring to the Aux. Power terminal.
7. Secure all cables with zip ties.
38
Hawkeye® 2 Installation Manual for ET Apache Sprayers MY 2017+

Advertisement

Table of Contents
loading

Table of Contents