INSTALLATION OVERVIEW

The recommended process for installing the Hawkeye® 2 nozzle control system is as follows:
1. Confirm Hawkeye® 2 kit contents. See "Kit Contents" on page 8.
2. Replace existing strainer with an 80 mesh (or finer) strainer.
3. Remove spray tips and flush each section individually for a minimum of 20 seconds to thoroughly flush the
boom.
4. Mount Hawkeye® 2 nozzle control valves.
5. Route and connect the inner, mid, and outer boom cables (as applicable).
6. Mount the RCM - Sprayer.
7. Route and connect chassis and RCM - Sprayer cables.
8. Review the Post-Installation Notes for machine configuration tips.

REQUIRED COMPONENTS

The following components must be installed with the Hawkeye® 2 nozzle control system:
• Updated software on field computers or control monitors
• PWM pump control valve
• Raven compatible flow meter
• Raven compatible pressure transducer
• 80 (or finer) mesh strainer
NOTE:
Air induction style spray tips should not be used with the Hawkeye® 2 nozzle control system. A fan or
cone style spray tip is required for the Hawkeye® 2 system to operate properly.

TOOLS AND MATERIALS NEEDED

The following tools are recommended for completing the installation:
• SAE and metric sized wrenches and tools
• Drill bit set and drill
• Corrosion X HD
• Cable ties (supplied)

POINT OF REFERENCE

The instructions provided in this manual assume the installer is standing behind the machine, looking toward the
machine cabin.
Introduction: Installation Overview
INTRODUCTION
7

Advertisement

Table of Contents
loading

Table of Contents