Assembling The Boiler - DeDietrich Innovens MCA 35 Installation And Service Manual

Wall-hung gas condensing boilers
Hide thumbs Also See for Innovens MCA 35:
Table of Contents

Advertisement

MCA 35
C002434-A
15/06/12 - 300022160-001-01
7.5.4.
1. Follow the procedure in reverse to re-assemble all of the
2. Fill the siphon with clean water up to the mark.
3. Put the siphon back in place.
4. Carefully open the main water valve, fill the installation, vent it and,
5. Check the seals on the gas and water connections.
6. Switch the boiler back on.
T001523-B

Assembling the boiler

components.
CAUTION
During inspection and maintenance operations, always
replace all gaskets on the parts removed.
CAUTION
Mount the vent hose above the siphon.
if need be, top it up with water.
7. Checking and maintenance
103

Advertisement

Table of Contents
loading

Table of Contents