Assembling The Boiler - DeDietrich MCA Pro 45 Installation And Service Manual

Wall-hung gas-fired condensing boilers
Table of Contents

Advertisement

7. Checking and maintenance

7.5.3. Assembling the boiler

1. Follow the procedure in reverse to re-assemble all
of the components.
Reinstall the front casing after start-up or
servicing
DANGER
Reinstall the front casing after start-up or servicing.
The front casing must be securely attached to
the boiler in order to prevent it from drawing air
from inside the boiler room. This is very important
especially if other appliances are located in the same
room as the boiler.
Inspect the gaskets of the front boiler casing.
There should be no tears or gaps in the gaskets.
If the gaskets are not in good condition, replace if
necessary.
If the front casing is not sealed or secured properly, it
could result in severe personal injury or death.
i
After a service complete the checklist.
See chapter: "Checklist for periodic
inspection and maintenance", page 114.
MCA-Pro ISM Rv.4.1 2/2017
MCA Pro 45/65/90/115
95

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mca pro 90Mca pro 115Mca pro 65

Table of Contents