Completing Commissioning - Siemens SIMOTICS CONNECT 600 Operating Instructions Manual

Connectivity module
Table of Contents

Advertisement

Commissioning

7.9 Completing commissioning

3. In the "Onboarding information" selection list, select the "Add configuration" entry.
The "MindSphere Onboarding Information" window is opened.
4. Click on "Read from file".
5. Select the connection key.
6. Confirm your entry with "OK".
7. Save the configuration using "Configuration > Save".
Result
The information for connecting the connectivity module to MindSphere has been configured.
You can read the connection status in the "MindConnect Bridge" application. You can see that a
connection has been successfully established with MindSphere in status messages "Last service
state: MAIN" and "Last MCL status: Success" in the status line in the lower part of the program
window.
See also
Prerequisites (Page 19)
7.9
Completing commissioning
1. Deactivate the service mode.
2. Disconnect the Remote Desktop Connection to the IPC.
3. Unplug the LAN cable from the "X3 P1" interface of the IPC.
38
Operating Instructions, 06/2020

Advertisement

Table of Contents
loading

Table of Contents