8 Insert the cable through the AC cable gland on the right and connect the
wires to the appropriate terminal connectors according to their labels:
PE, L1, L2, L3 and N.

Figure 11: Inserting the Cable Through the AC Cable Gland

9 Tighten the screws of each wire terminal according to the following torque:
Tightening moment of terminal 0.5-0.6 Nm.
Gland torque 2.8-3.3 Nm.
10 Verify that there are no whiskers in each terminal connector and that
the unused ports of the terminals are sealed.
Connecting Cables to the Three Phase Inverter
Chassis
To connect DC cables to the Three Phase Inverter:
1 Connect the DC connectors from the photovoltaic installation to the
DC+ and DC- connectors as indicated.
Two strings may be connected in parallel to both DC inputs of the
inverter. They are simply wired together in the terminal block inside.

Figure 12: Connecting the DC Cables to the Inverter