Synergy Manager External Cable Interface

The connectors and glands, at the bottom side of the Synergy Manager, interfaces the
inverter to the grid and PV strings. The communication glands, support communication
cables connecting the inverter to the SolarEdge Monitoring platform and external
power bank used for setting up the inverter in sites with no available grid power.
Figure 10: Synergy Manager with MC4 connectors - bottom view
Figure 11: Synergy Manager with glands - bottom view
Protective Earth (PE) Wire Entry: PE gland for connecting Protective Earth (PE) wire
AC Cable Entry: AC cable gland for grid connection
DC Connectors: MC4 cable connectors for connecting the PV Strings
Power Bank Input: power bank connection enables inverter pre-commissioning
when AC power is not connected
Three Phase Inverter with Synergy Technology P/N: SExxK-xxxxIxxxx SExxK-xxxxIxxxx
Chapter 3: Installing the Synergy Manager and Synergy Units