Synchronization (Mp60) - HBM MP60 Operating Manual

Pme industrial measurement electronics with fieldbus link
Table of Contents

Advertisement

26
PME-MP60/MP07

4.6 Synchronization (MP60)

Synchronization of modules guarantees the simultaneous acquisition and
processing of measurement data.
S10
S10
ON
ON
Slave
Master
S10
1 2 3 4 5 6
1 2 34 5 6
Fig. 4.9: Set up master/slave
When synchronising several modules, one device is to be declared as the
master. Set up all the other instruments as slaves.
Synchronization between modules should always - even if working without a
CAN-bus - be effected via the flat ribbon cable.
HBM
A0616-13.4 en

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mp07

Table of Contents