Commissioning - HBM MP60 Operating Manual

Pme industrial measurement electronics with fieldbus link
Table of Contents

Advertisement

30

5.2 Commissioning

D Set the DIP switches according to Chapter 2 (page 12 and 13).
D Connect the power supply cable and transducers to the module as
described in Chapters 4.2 and 4.4.
CAUTION
Please note the safety instructions here!
D Switch on the power supply.
The device carries out a function test (approx. 15 secs.) and is then in
measuring mode, if everything runs correctly. During the function test,
the control outputs remain at 0 V.
NOTE
If the error message HardwOvf is displayed at this point, please refer to
the Chapter called 8 "Error messages" for further details.
In addition, the yellow LED indicates that the MP60 is ready to start
measuring.
You will find the meanings of other LED signals in the chapter called 8 "Error
messages".
HBM
PME-MP60/MP07
A0616-13.4 en

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mp07

Table of Contents