IBM xSeries 240 81Y Hardware Maintenance Manual page 183

Table of Contents

Advertisement

c. Align the panel with its new location 2 , making
sure that:
The power control button is positioned
above the reset button.
The tab on the server inside front goes
between the two posts on the power switch
panel.
d. Place the squared end of the power switch panel
bracket into the bottom opening, and press the
other end of the bracket toward the server front
until the bracket clicks into place.
11. Move the operator LED panel 2 to its new location
1 .
a. Remove the operator LED panel bracket by
pressing firmly on the bottom of the bracket (on
the arrow closer to the server) and pulling the
bracket away from the server.
b. Unplug the cable from the back of the operator
LED panel.
175
xSeries 240

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Xseries 240 8ry

Table of Contents