Port Tests - ADTRAN TSU 120 User Manual

Adtran network device user manual tsu 120 & 120e
Hide thumbs Also See for TSU 120:
Table of Contents

Advertisement

Chapter 7. Test Menu
The self-test consists of the following tests:
A test pattern is sent from the controller through a loopback on
all other boards and is checked on the controller. This verifies
the data path, clocks, and control signals.
If a failure is detected, note the failure number and contact
ADTRAN Technical Support.

Port Tests

The Port Tests menu is used to activate testing of specific data
ports. It controls the activation of loopbacks and the initiation
of data test patterns. Test results are displayed in the LCD win-
dow.
7-8
B
L
T
OARD
EVEL
ESTS
U
L
T
NIT
EVEL
ESTS
Executing the self-test will disrupt normal data flow and prevent
remote communication until it is complete.
Port tests execution will disrupt normal data flow in the port be-
ing tested.
TSU 120 User Manual
Each of the TSU 120 boards contain an
on-board processor which executes a
series of tests checking the circuitry
on the board.
RAM tests; EPROM checksum
DS0 map tests
On-board data path; sending a
known test pattern through an on-
board loop
Front panel LED verification
Phase Lock Loop verify
Board-to-board interface test
61202129L1-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tsu 120e

Table of Contents