Connecting Industrial Enclosure; Preparing Industrial Enclosure Connections - Siemens SITRANS FS230 Compact Operating Instructions

Ultrasonic flowmeters
Table of Contents

Advertisement

4.6

Connecting industrial enclosure

4.6.1

Preparing industrial enclosure connections

Access to terminal compartment
As long as the device is energized, the lid of the enclosure on the sensor connection area may
only be opened by qualified personnel.
Before removing the terminal cover, the auxiliary power must be switched off from all poles.
Following installation, the terminal cover must be screwed back on again.
1. Remove blind plugs where required and mount cable glands.
2. Remove lid lock screw for terminal connections lid.
3. Remove lid for terminal connections.
A label showing the configuration is placed at the back of the terminal connections lid.
SITRANS FS230
Compact Operating Instructions, 05/2021, A5E38755607-AC
WARNING
2
3
Input/output connection (channels 2 to 4)
Power supply connection
Current output/communication outputs (channel 1)
1
4.6 Connecting industrial enclosure
Connecting
51

Advertisement

Table of Contents
loading

Table of Contents