Section 8: Master Controller (PLC) Commissioning
April 2021
It is suggested to follow the next step in order to Load the Hardware configuration to the PLC.
Figure 20
Figure 21
Figure 22
20
Configure Network and Compile from the SIMATIC NetPro.
Save and Compile from the HW configuration.
Finally Load to the PLC.
Installation, Operation and Maintenance Manual
Master Controller (PLC) Commissioning
MDE 256 Rev. 1