Sync Cable For Double Doors (Synchronizing Of 2 Operators) - Assa Abloy SW100 Installation And Service Manual

Swing door operator
Hide thumbs Also See for SW100:
Table of Contents

Advertisement

7 Part identification & Accessories
7.9

Sync cable for double doors (synchronizing of 2 operators)

Note! Connect a cable between primary CU and secondary CU.
Primary
Note! The connection/marking of the sync cable determines which of the operators is the primary
and secondary.
For a Rebated door;
• the Primary door must open before the secondary door
• the secondary door must close before the Primary door
How to cut the jumper for double doors
Function
Opening
Synchronous
Synchronous
Asynchronous
Double egress
Rebated
24
Primary
Secondary
Black
Door design
Closing
Rebated
Synchronous
Asynchronous
Asynchronous
Issue 2021-02-24
Secondary
Red
Cut the jumper with color
Jamming
Primary side
No
No
No cutting
Yes
No
Cut black
Yes
Yes
No cutting
Cut black
Jamming
Secondary side
No cutting
No cutting
Cut red
Cut red
No jamming
1005088-en-22.0

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sw100-specSw100-2

Table of Contents