Installation; Masonry Installation; Flue Installation Options - Rinnai RDV600ER Installation Manual

Hide thumbs Also See for RDV600ER:
Table of Contents

Advertisement

MASONRY INSTALLATION

Read this manual thoroughly and gain a full understanding of the requirements before undertaking
installation. Ensure gas supply to heater is turned off for the first stages of this instruction.
IMPORTANT

FLUE INSTALLATION OPTIONS

Step 1
Prepare Site – p. 17
Step 2
Unpack the Heater – p. 17
Step 3
Masonry Flue Installation – p.17
Step 4
Positioning The Heater Engine – p.18
Step 5
Connect Electrical Supply – p.18
Step 6
Prepare Gas Supply – p.18
Step 1.
Prepare Site
Ensure the intended enclosure meets the requirements of the dimensions as stipulated in
"ENCLOSURE REQUIREMENTS" on page 8 and that gas and electrical supplies have been
prepared in accordance with the dimensions stipulated in "GAS SUPPLY" on page 10 and
IMPORTANT
"ELECTRICAL SUPPLY" on page 11.
In a masonry fireplace use a slurry of sand and cement to level the base as required.
Step 2.
Unpack The Heater Engine
The heater engine is supplied in one carton, check to ensure you have all contents as listed under "BEFORE
YOU START" on page 7 at the start of this manual before proceeding. Carefully remove carton by removing
the straps and lifting the carton off the appliance. Remove all packaging materials and check all components for
damage. If ANY damage is evident DO NOT install or operate this appliance. Contact your supplier for advice.
Retain the cardboard carton for use in the "Positioning The Heater Engine" on page 18.
HINT
Step 3.
Masonry Flue Installation
Connect both the Ø 100mm exhaust pipe
(A) and the Ø 75mm inlet pipe (B) flues to
the masonry cowl (C1) / co-linear to coaxial
adaptor (C2), noting that the larger diameter
pipe is for the exhaust, securing both pipes
to the cowl / co-linear to coaxial adaptor
firmly with pipe clamps (D).
Feed the flexi-liner flue pipes down the
chimney ensuring that exhaust pipe (A) is
on the right when being viewed from the
front of the fireplace. Once the pipe ends
are accessible from fire place, the cowl /
co-linear to coaxial adaptor components
may then be secured and weather sealed in
place.
At the fire place attach both exhaust pipe
(A) and inlet pipe (B) flues to the engines
spigot plate (E), noting again that the larger
diameter pipe is for the exhaust, when
viewed from the front this will be to the right.
Secure both pipes to the spigot plate (E)
firmly with pipe clamps (F).
A horizontal masonry installation MUST use a horizontal masonry terminal mount to affix the
co-linear adaptor and the horizontal wall terminal to the exterior wall
IMPORTANT
Rinnai
Step 7
Insert Heater Engine Into Fireplace – p.18
Step 8
Securing The Heater Engine – p.18
Step 9
CONNECTING THE GAS SUPPLY – p.23
Step 10
LEAK TESTING – p.23
Step 11
BURNER MEDIA INSTALLATION – p.24
Step 12
COMMISSIONING INSTRUCTIONS – p.27
D
B
A
F
17

INSTALLATION

C1
C1
A
B
A
From the top of
the heater engine
B
E
E
RDV 600_700ER IM
C2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rdv700er

Table of Contents