Before You Start; Installation Requirements; Certification; Carton Contents / Item Checklist - Rinnai RIBF25N Operation & Installation Manual

Gas log flame fire
Table of Contents

Advertisement

INSTALLATION REQUIREMENTS

This heater must be installed by an authorised person. The installation must conform to local regulations.
The installation must also comply with the instructions supplied by Rinnai.
Service and removal must be carried out by an authorised person.

CERTIFICATION

®
The Rinnai Slimfire
252 has been certified by the Australian Gas Association.
The AGA Certification Number is shown on the appliance dataplate.
No parts or functions should be modified or permanently removed from the heater.
Please keep these instructions in a safe place for future reference.

CARTON CONTENTS / ITEM CHECKLIST

The components for Slimfire 252 heater are supplied in separate cartons, the following tables list which
components are in each carton. Ensure that the components listed for the installation method being installed are
present before proceeding with the installation.
The Engine and Fascia are packed into two separate cartons and are required for all installation
types. Masonry installations may require a flexiliner flue to be installed, refer to "MASONRY FLUE
IMPORTANT
INSTALLATION" on page 17 for details. The Zero Clearance Kit and flue are purchased separately.
A
2
5
Component Descriptions
Rinnai Slimfire 252 Engine.
1
Artificial log set / burn media, Satchel burner granules (packed on top of the engine).
2
½" BSP Flared nut (x1shipped inside engine, attached to gas connection).
3
Adhesive backed foam sealing strip.
4
Operation and Installation manual.
5
Fascia Mounting Screws (x2 pre-installed in the engine fascia mounting brackets).
6
Fascia.
7
Glass dress guard.
8
Transition box rails (x2).
9
Transition box upper.
10
Transition box lower.
11
Transition box guide plate.
12
Zero Clearance Box - Top panel.
13
Zero Clearance Box - Base panel.
14
Zero Clearance Box - Rear panel.
15
Zero Clearance Box - Left & Right side panels.
16
Packet assembly screws, rivets and grommet.
17
Rinnai Australia

BEFORE YOU START

2
5
4
3
B
C
12
8
9
1
10
16
15
11
14
17
Carton Contents
A
B
Engine
Fascia
Slimfire 252 Operation & Installation Manual
13
16
C
Zero
Clearance Kit

Advertisement

Table of Contents
loading

This manual is also suitable for:

Slimfire 252Ribf25l

Table of Contents