Figure 62 Main Bay Cover's Front Hinge Pin - Seagate Exos CORVAULT Hardware Installation And Maintenance Manual

Hide thumbs Also See for Exos CORVAULT:
Table of Contents

Advertisement

Figure 62 Main bay cover's front hinge pin

6. Set the main bay cover aside.
7. (Optional) If you need to replace the main bay cover with a new one, retrieve it from its container, inspect it for
damage, and orient it so to match the final removal position of the damaged one.
8. Fold the main bay cover in half, with the front half under and matching the rear half.
9. Orient the main bay cover hinges to the hinge pin slot.
10. Gently slide the hinge pins along the chassis until the hinges sink down into the hinge pin slot.
11. Carefully lower both halves toward the front until the front half engages in the locked position.
12. Lift the back half away from the front half, still resting the hinged section on the chassis until engaging the rear half
in the locked position.
IMPORTANT Do not proceed until you perform a visual inspection to verify all main bay cover edges connect
completely with supporting surfaces, both hinge mechanisms are at the bottom of the pin slots, and latches for both
halves fully engage.
13. Facing the front panel, carefully exert even pressure on both sides of the storage enclosure front and continue
insertion all the way into the rack until the mounting flange is flush with the rack ears, locking the storage enclosure
into the storage position. Do not force insertion, which could damage the rails.
14. Secure storage enclosure chassis flanges to the rack, fastening both top captive thumbscrews until tight.
Replace an auxiliary bay cover
The auxiliary bay cover protects related components and assists with containing airflow to cool the auxiliary bay.
You can still maintain continuous operation during the replacement of the auxiliary bay cover, as long as it is within the
time limit of eight (8) minutes, since removal of the auxiliary bay cover impacts airflow in the auxiliary bay.
CAUTION If you remove any FRU while the storage enclosure is powered up, you must replace it with a known
good spare within the allotted time for that FRU. If you do not replace the FRU and, when applicable, close the related
78            Chapter 7   In-service field maintenance

Advertisement

Table of Contents
loading

Table of Contents