Kärcher MC 250 Implements Manual page 22

Hide thumbs Also See for MC 250 Implements:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 21
Front locking bolts
1
Spring pin
2
5. First pull out the spring pins and then pull out the front
locking bolts (left and right).
6. Raise the waste container slightly and fold the safety
brackets rearward into the storage position.
7. Lower the waste container completely.
8. Depressurise the rear hydraulic system, see chapter
"Hydraulic pressure relief".
Rear hydraulic connections
1
9. Disconnect the hydraulic hoses of the waste container
from the hydraulic connections.
Power supply plug
1
High-pressure cleaner water connection (option)
2
High-pressure cleaner (Option)
3
10.Pull out the power supply plug.
11.With optional high-pressure cleaner: Disconnect the
water connection.
22
Illustration symbolic
Rear side cover
1
Rear support
2
Locking button
3
Crank
4
12.Swing the side covers (left and right) outwards.
13.Push in the rear supports (left and right) all the way to
the end stop while pulling out the red retaining head. Re-
lease the locking button to lock. Finally, check that the
supports are locked securely.
14.Attach and secure the front supports as already de-
scribed for the rear supports.
Note
The front supports are marked and only fit on the corre-
sponding side.
Rear locking bolts
1
Note
Another variant has long locking bolts for locking/un-
locking the waste container to/from the ball fasteners at
the front and rear.
Spring pin
2
15.Pull out the spring pins and then crank the rear sup-
ports upwards until the locking bolts at the rear (left and
right) can be pulled out. Open the tailgate of the waste
container first, in order to pull out the spring pins.
English

Advertisement

Table of Contents
loading

Table of Contents