Connect Gases
Procedure
Evacuate manifold.
Specify units of measure.
Connect gas lines.
Clean and verify gas lines.
Specify Gases
Procedure
Gases entered in application?
TriStar II 3020 Confirm Installation Instructions and Checklist
302-42870-04 (Rev A) — Sep 2017
6 Installation Checklists
Evaluation
Initial /
Code
Date
P
F
N/A
P
F
N/A
P
F
N/A
P
F
N/A
Evaluation
Initial /
Code
Date
P
F
N/A
6 - 5
Need help?
Do you have a question about the TriStar II 3020 and is the answer not in the manual?
Questions and answers