Use these codes to complete the tables in this section, then initial and date each section. If the table
has an Initial / Date column, the person completing the procedure should enter their initials and the
date.
P
Pass. Indicates that this procedure has been successfully completed without error.
F
Fail. Indicates that this procedure has been unsuccessful and prevents the analyzer
from being installed for use.
Y
Yes. Indicates that this procedure has been performed.
N
No. Indicates that this procedure has not been performed.
N/A
Not Applicable. Indicates that this procedure does not apply to your system.
Prepare for Installation
Procedure
Review the Pre-installation Instructions and Checklist document and ensure
that the laboratory is prepared for installation.
Ensure that the required personnel are available.
Ensure that all equipment has been unpacked and verified using the packing
list.
Analyzer is located in a suitable environment
Line voltage has been verified to be within tolerances and changed if required.
TriStar II 3020 Confirm Installation Instructions and Checklist
302-42870-04 (Rev A) — Sep 2017
C
HECKLISTS
6 Installation Checklists
Evaluation Code
P
F
N/A
P
F
N/A
P
F
N/A
P
F
N/A
P
F
N/A
6 - 1