A R
C
UN
ONDITIONS
A
B
UTOMATIC
LANK
The TriStar II 3020 application contains an automated procedure of conducting the blank tube run.
Use following steps to create blank tube run conditions and start the procedure.
1. Go to Unit 1 > Service Test > PCP Analysis.
2. In the Analysis Type group box, select Nitrogen Blank.
3. Click Start.
4. When the run is complete, a report is created for each sample port. The Isotherm report con-
tains summary information about the run.
M
B
ANUAL
LANK
S
I
AMPLE
NFORMATION
Field
Sample
Operator
Submitter
Mass
Density
Type of Data
S
T
F
AMPLE
UBE
ILE
Field
SampleTube
Stem Diameter
Physical volume below mark
User Isothermal Jacket
Use Filler Rod
TriStar II 3020 Confirm Installation Instructions and Checklist
302-42870-04 (Rev A) — Sep 2017
R
C
UN
ONDITIONS
R
C
UN
ONDITIONS
F
S
ILE
ETTINGS
Enter
Blank Tube Test
Enter the Operator initials.
Analyzer Serial Number
1.0000 g
1.0000 cm
Automatically Collected
S
ETTINGS
Enter
Default 3/8 in. Sample Tube
3/8 in.
4.8608 cm
Yes
Yes
3
/g
3
A Run Conditions
A - 1
Need help?
Do you have a question about the TriStar II 3020 and is the answer not in the manual?
Questions and answers