5 Operational Verification
4. Place the connector nut, ferrule, and O-ring onto the sample tube stem.
5. Attach the sample tube to the analysis port and ensure it is completely in the port. Securely
screw the connector nut onto the analysis port. Hand-tighten the connector nut.
6. Slide the dewar cover upward until it stops.
F
I
ILL AND
NSTALL THE
The equipment images in this document may differ slightly from your equipment, how-
ever the instructions are the same unless otherwise noted.
See also:
Dewar Precautions on page 1 - 2
5 - 12
D
EWAR
TriStar II 3020 Confirm Installation Instructions and Checklist
302-42870-04 (Rev A) — Sep 2017
Need help?
Do you have a question about the TriStar II 3020 and is the answer not in the manual?
Questions and answers