L-Acoustics Kara IIi Owner's Manual page 85

Table of Contents

Advertisement

Risk of crushing injury
Keep ngers away from underneath the enclosure.
4. Secure additional SB18 IIi (equipped with rigging plates) on top of the rst one.
Adjusting the gap between stacked enclosures
Place a wedge or a lever between the two enclosures to align the rigging with the inserts.
Be careful not to scratch the paint.
The last SB18 IIi must be equipped with SB18IIi-ENDLINK.
5. Remove the top rigging screws from the last SB18 IIi.
6. Tighten all the screws on the array.
Apply a torque of 5 N.m.
Kara IIi owner's manual (EN) version 2.0
Rigging procedures
85

Advertisement

Table of Contents
loading

Table of Contents