L-Acoustics Kara IIi Owner's Manual page 72

Table of Contents

Advertisement

Rigging procedures
c) Tighten all the screws on the supporting enclosure.
Apply a torque of 5 N.m.
6. If necessary, repeat step
7. Tighten all the screws on the last enclosure.
8. Check that all the screws are secured and tightened.
What to do next
• Exchange the Kara IIi grills so that the logo is positionned on the right-hand side:
(p.92),
• or secure a screen:
Securing a screen
72
5
(p.71) for the last enclosure.
(p.94)
5 N.m
5 N.m
Exchanging Kara IIi grills
Kara IIi owner's manual (EN) version 2.0

Advertisement

Table of Contents
loading

Table of Contents