L-Acoustics Kara IIi Owner's Manual page 75

Table of Contents

Advertisement

b) Secure SB18IIi-ENDLINK on the enclosure.
Do not secure the top screws.
This step requires three operators.
Hold the enclosure at the bottom until the rigging plates are secured.
3. Lift SB18 IIi and secure it to the slotted holes on KARAIIi-FIXBRACKET with rigging screws.
Apply a 5 N.m. torque.
4. Remove the bottom rigging screws from SB18 IIi.
5. Secure up to two Kara IIi under the array with KARAIIi-TILT. Refer to
6. Check that all the screws are secured and tightened.
What to do next
Securing a screen
(p.94)
Kara IIi owner's manual (EN) version 2.0
5 N.m
SB18 IIi / Kara IIi array assembly
Rigging procedures
(p.55).
75

Advertisement

Table of Contents
loading

Table of Contents