START OF OPERATIONS
5 Start of Operations
Please
and operating staff) before starting installation.
Tool List
No tools are required for installation.
Fastening lifting device
Attachment point for flange plate
25
read chapter 1.8 (Requirements & instructions for installation, maintenance
Suspension bolt
Flange plate (optional)
Need help?
Do you have a question about the SH-3500-B and is the answer not in the manual?
Questions and answers