Unpacking The Shipping Container - Avaya Virtual Services Platform 9000 Installation Manual

Hide thumbs Also See for Virtual Services Platform 9000:
Table of Contents

Advertisement

Procedure
Securing the chassis in a mid-mount configuration
Grounding the chassis

Unpacking the shipping container

Remove the equipment in the shipping container. In addition to the chassis, the shipping container
includes an installation kit and a cover panel kit.
About this task
The installation kit includes extra screws and bolts to support a variety of installation options. You do
not need to use all of the hardware provided.
If the installation kit does not contain all of the components, contact Avaya Support.
Procedure
Unpack the shipping container for the AC chassis.
October 2015
Virtual Services Platform 9010 chassis installation
Time requirement
12–30 minutes
12 minutes
Installing the Avaya VSP 9000
Comments on this document? infodev@avaya.com
29

Advertisement

Table of Contents
loading

Table of Contents