Avaya Virtual Services Platform 9000 Series Installation Manual

Hide thumbs Also See for Virtual Services Platform 9000 Series:

Advertisement

Installation — Chassis
Avaya Virtual Services Platform 9000
3.1
NN46250-304, 02.02
October 2011

Advertisement

Table of Contents
loading

Summary of Contents for Avaya Virtual Services Platform 9000 Series

  • Page 1 Installation — Chassis Avaya Virtual Services Platform 9000 NN46250-304, 02.02 October 2011...
  • Page 2 Product provided by Avaya including the selection, arrangement and While reasonable efforts have been made to ensure that the design of the content is owned either by Avaya or its licensors and is information in this document is complete and accurate at the time of protected by copyright and other intellectual property laws including the printing, Avaya assumes no liability for any errors.
  • Page 3: Table Of Contents

    Chapter 9: Translations of safety messages..............Chapter 10: Customer service................... Getting technical documentation....................... 59 Getting product training..........................59 Getting help from a distributor or reseller....................59 Getting technical support from the Avaya Web site.................. 60 Index............................. Installation — Chassis October 2011...
  • Page 4 Installation — Chassis October 2011...
  • Page 5: Chapter 1: New In This Release

    Chapter 1: New in this release The following sections detail what's new in Avaya Virtual Services Platform 9000 Installation—Chassis (NN46250–304) for release 3.1. • Features on page 5 • Other changes on page 5 Features There are no feature changes.
  • Page 6 New in this release Installation — Chassis October 2011 Comments? infodev@avaya.com...
  • Page 7: Chapter 2: Introduction

    The Avaya Virtual Services Platform 9000 chassis provides the physical framework for the Avaya Virtual Services Platform 9000 modules. This document provides the instructions to install the Avaya Virtual Services Platform 9000 chassis in an equipment rack and describes how to power on the Avaya Virtual Services Platform 9000. This document includes technical specifications for the chassis.
  • Page 8 Introduction Installation — Chassis October 2011 Comments? infodev@avaya.com...
  • Page 9: Chapter 3: 9012 Chassis Installation Fundamentals

    Chapter 3: 9012 chassis installation fundamentals The Avaya Virtual Services Platform 9000 chassis consists of a sheet metal enclosure, a midplane, cooling modules, and power supplies. The number of power supplies needed depends on the specific hardware configuration and redundancy needs.
  • Page 10 AC power to their corresponding power supply bays. The following figure shows the rear view of the chassis. The ground bonding location is located in the bottom right part of the chassis. Installation — Chassis October 2011 Comments? infodev@avaya.com...
  • Page 11: Power Supplies

    Power supplies Figure 2: Virtual Services Platform 9000 chassis rear view Power supplies This section describes the 9006 AC power supply, the power inlets and how to plan for feed and power supply redundancy. • 9006AC power supply on page 12 •...
  • Page 12 9012 chassis installation fundamentals 9006AC power supply The Avaya Virtual Services Platform 9000 chassis has six bays for AC power supply installation. Install the power supplies in the front of the chassis and plug the power plugs in the corresponding power inlets at the back of the chassis.
  • Page 13: Cooling Modules

    Switch Fabric module With Release 3.1, you must install a minimum of three SF modules in the chassis. Avaya recommends that you install a minimum of four SF modules for redundancy. You must install an SF module in slots SF1 and SF4; install a third SF module in one of the remaining slots.
  • Page 14: Control Processor Module

    Important: Avaya recommends that you install SF modules in both Slot 1 and Slot 4 (to provide redundancy). You must have a functioning SF module in at least one of those slots for proper operation of the interface modules.
  • Page 15: Hardware Requirements

    Use the following guidelines to plan front and rear access: • For proper ventilation, Avaya recommends 36 inches (in.) (91 centimeters [cm]) of free space in both the front and the back of the machine, and also 6 in. (15.2 cm) on each side.
  • Page 16 One left front cable Manage network interface cables. management bracket Grounding kit hardware Connects the chassis to the ground of the rack. The following figure illustrates the accessories in the chassis shipping container. Installation — Chassis October 2011 Comments? infodev@avaya.com...
  • Page 17 To configure startup options and to monitor the results of startup diagnostics, you can attach a PC, laptop, VT100 console or equivalent, such as a PC terminal emulator. The hardware required to mount the Avaya Virtual Services Platform 9000 chassis in an equipment rack depends on your equipment rack type.
  • Page 18: Successful Installation Verification

    If the LEDs on the modules light in this sequence, your installation is successful. Contact your network administrator to verify that the Avaya Virtual Services Platform 9000 connects to the network. If the LEDs do not light in this sequence, contact your local Avaya Technical Solutions Center. Chassis installation time requirements The following table lists the procedures you perform to install the Virtual Services Platform 9000 chassis and the estimated time you need to complete each procedure.
  • Page 19: Chapter 4: 9012 Chassis Installation

    About this task This section describes how to install the Avaya Virtual Services Platform 9000 chassis. Before you begin the installation of the Avaya Virtual Services Platform 9000 chassis, ensure you have completed the following actions: • Inspect all items for shipping damage. If you find items that are damaged, do not install the chassis.
  • Page 20 9012 chassis installation Figure 4: 9012 chassis installation procedures Installation — Chassis October 2011 Comments? infodev@avaya.com...
  • Page 21: Unpack The Installation Kit

    Extra screws and bolts are included to support a variety of installation options. You may not need to use all of the hardware provided. If the installation kit does not contain the above components, contact Avaya Support. Installation — Chassis...
  • Page 22: Install The Installation Shelf

    2. If the holes in the vertical supports require clip nuts, insert a clip nut in each of the 14 locations where you marked the holes. Clip nuts are included. If necessary, use the clip nuts for your specific rack model. Installation — Chassis October 2011 Comments? infodev@avaya.com...
  • Page 23 Install the installation shelf 3. Place the installation shelf at the mark on the rack, inside the rails. Hold the installation shelf in position, and then align the mounting rail with the two holes on each side of the vertical rack support. 4.
  • Page 24: Reduce The Chassis Weight

    Reduce the chassis weight to make the chassis easier to lift and to reduce the risk of personal injury or equipment damage. Procedure 1. Remove the 10 I/O filler modules from the front of the chassis. 2. Remove the 2 cooling modules from the front of the chassis. Installation — Chassis October 2011 Comments? infodev@avaya.com...
  • Page 25 Reduce the chassis weight 3. Unseat the I/O filler module by loosening the 2 captive screws, grasping the two handles, and gently pulling the module out and away from the chassis. 4. Remove the cooling modules by pulling the retaining pin that holds it in place while gently pulling the module’s handle to move it out and away from the chassis.
  • Page 26: Lift The Chassis

    Lift the chassis About this task The chassis weighs in excess of 160 lb (73 kg) and requires a minimum of three people to lift. Always use a mechanical lift when one is available. Installation — Chassis October 2011 Comments? infodev@avaya.com...
  • Page 27: Secure The Chassis

    Take care to lift the chassis from the bottom. Secure the chassis About this task Mount the Avaya Virtual Services Platform 9000 chassis in a standard two-post or four-post equipment rack. Procedure 1.
  • Page 28: Assemble And Install Cable Management Brackets

    1. Attach the three Z brackets to the vertical cable bracket as shown below using 6 of the screws provided. Nuts are not required since the Z brackets are already threaded on one side for connection to the I/O cable bracket using screws alone. Installation — Chassis October 2011 Comments? infodev@avaya.com...
  • Page 29 Assemble and install cable management brackets 2. Use 3 Phillips screws to fasten the I/O cable management assembly to the top, middle and bottom screw positions of the left flange and rail. 3. Remove the two upper screws from the power cable receptacle panel on the rear of the chassis.
  • Page 30: Grounding The Chassis

    • Ensure you have a 6 mm socket or nut driver. About this task Avaya recommends that you ground the Avaya Virtual Services Platform 9000 chassis before you install power supplies or connect power and network cables to the system.
  • Page 31 Grounding the chassis 3. Bond the chassis ground cable to the single point ground window. Job aid The following figure shows an example of how to attach the chassis ground cable to the rack grounding strip. Installation — Chassis October 2011...
  • Page 32 9012 chassis installation Figure 5: Rack grounding strip example Installation — Chassis October 2011 Comments? infodev@avaya.com...
  • Page 33 Grounding the chassis The following figure shows the ESD ground strap input location on the front of the chassis. There are also two ESD ground strap input sites on the rear of the chassis. Installation — Chassis October 2011...
  • Page 34 9012 chassis installation Installation — Chassis October 2011 Comments? infodev@avaya.com...
  • Page 35: Chapter 5: Chassis Operations

    Chapter 5: Chassis operations About this task This section describes some of the routine tasks you perform to operate the Avaya Virtual Services Platform 9000. • Determining the minimum number of AC power supplies on page 35 • Powering up the system on page 36 •...
  • Page 36: Powering Up The System

    The AC power switches are double pole. The 9006AC power supply incorporates double pole and neutral fusing. About this task Connect the power supplies and power up the system to start up the Avaya Virtual Services Platform 9000. Procedure 1. Determine power subsystem operating configuration based on module load requirements and power redundancy needs.
  • Page 37: Resetting The Avaya Virtual Services Platform 9000

    If the problem persists, contact the Avaya Technical Solutions Center. Resetting the Avaya Virtual Services Platform 9000 About this task Reset the Avaya Virtual Services Platform 9000 to restart the hardware without cycling power. Procedure On the CP module, press Reset.
  • Page 38 Chassis operations Installation — Chassis October 2011 Comments? infodev@avaya.com...
  • Page 39: Chapter 6: Part Numbers

    Chapter 6: Part numbers The following table lists the Avaya Virtual Services Platform 9000 part numbers associated with the hardware. Products can be ordered with European Union Environmental Directive (EUED) Restriction of Hazardous Substances (RoHS) (EUED RoHS) compliancy. EUED RoHS compliant products are designated with - E5 or -E6 (for example EC1405A01-E6).
  • Page 40 Part numbers Installation — Chassis October 2011 Comments? infodev@avaya.com...
  • Page 41: Chapter 7: Technical Specifications

    Chapter 7: Technical specifications This section details the specifications for the Avaya Virtual Services Platform 9000. • Chassis weight on page 41 • AC power supply on page 41 • Component input power on page 42 • Power supply selection on page 43 •...
  • Page 42: Component Input Power

    • 80 Watts (W) each for the primary and secondary Control Processor (CP) modules • 70 W each for the Switch Fabric (SF) modules located in slots 1 and 4 • 150 W each for the two IO fan trays Installation — Chassis October 2011 Comments? infodev@avaya.com...
  • Page 43: Rack Mount

    9024XL interface module 1962 Rack mount You can install a maximum of three Avaya Virtual Services Platform 9000 chassis in a standard 19 in. wide 7 ft. tall rack. Important: Chassis units should be installed from the bottom up to ensure racks do not become top heavy and fall over.
  • Page 44: Virtual Services Platform 9000 Chassis Specifications

    Maximum airflow on page 45 • International regulatory requirements on page 45 Physical specifications The following physical specifications apply to the Avaya Virtual Services Platform 9000 chassis. Table 8: 9012 chassis physical specifications Parameter Specification Height 24.375 in. (61.91 cm)
  • Page 45 Virtual Services Platform 9000 chassis specifications Table 9: 9012 chassis environmental specifications Parameter Specification Operating temperature 0C to 40C (32F to 104F) Storage temperature – 25C to 70C (– 13F to 158F) Operating humidity 10% to 90% Storage humidity 0 to 90% Operating altitude 0 ft to 10 000 ft Storage altitude...
  • Page 46 Parameter Specification Global basis for certification IEC 60950-1 current edition with all CB member deviations ULIEC 60950-1 Canada CSA 22.2 No. IEC 60950-1 Europe ENIEC 60950-1 (CE Marking) Australia/New Zealand AS/NZS IEC 60950-1 Installation — Chassis October 2011 Comments? infodev@avaya.com...
  • Page 47: Chapter 8: Regulatory Information And Safety Precautions

    Read the information in this section to learn about regulatory conformities and compliances. International Regulatory Statements of Conformity This is to certify that the Avaya Virtual Services Platform 9000 chassis and components installed within the chassis were evaluated to the international regulatory standards for...
  • Page 48 All products labeled with the CE marking comply with R&TTE Directive (1999/5/ EEC) which includes the Electromagnetic Compliance (EMC) Directive (2004/108/EC) and the Low Voltage Directive (2006/95/EC) issued by the Commission of the European Community. Installation — Chassis October 2011 Comments? infodev@avaya.com...
  • Page 49: National Safety Statements Of Compliance

    National Safety Statements of Compliance Compliance with these directives implies conformity to the following European Norms (ENs). The equivalent international standards are listed in parenthesis. • EN 55022 (CISPR 22)–Electromagnetic Interference • EN 55024 (IEC 61000-4-2, -3, -4, -5, -6, -8, -11)–Electromagnetic Immunity •...
  • Page 50: Safety Messages

    Denan Statement (Japan/Nippon only) Safety Messages This section describes the different precautionary notices used in this document. This section also contains precautionary notices that you must read for safe operation of the Avaya Virtual Services Platform 9000. Notices Notice paragraphs alert you about issues that require your attention. The following sections describe the types of notices.
  • Page 51 Achtungshinweise bieten Informationen dazu, wie man mögliche Dienstunterbrechungen oder Schäden an Avaya-Produkten verhindert. Caution: PRECAUCIÓN Los avisos de Precaución brindan información acerca de cómo evitar posibles interrupciones del servicio o el daño a los productos Avaya. Installation — Chassis October 2011...
  • Page 52 Avaya products. Warning: AVERTISSEMENT La mention Avertissement fournit des informations sur les moyens de prévenir les risques de blessure lors de la manipulation de produits Avaya. Warning: WARNUNG Warnhinweise bieten Informationen dazu, wie man Personenschäden bei der Arbeit mit Avaya-Produkten verhindert.
  • Page 53 Safety Messages Danger High Voltage Notice Voltage: Danger—High Voltage notices provide information about how to avoid a situation or condition that can cause serious personal injury or death from high voltage or electric shock. Voltage: La mention Danger—Tension élevée fournit des informations sur les moyens de prévenir une situation ou une condition qui pourrait entraîner un risque de blessure grave ou mortelle à...
  • Page 54 Avisos de perigo oferecem informações sobre como evitar uma situação ou condição que possa causar graves ferimentos ou morte. Danger: PERICOLO Le indicazioni di pericolo forniscono informazioni per evitare situazioni o condizioni che potrebbero causare gravi danni alle persone o il decesso. Installation — Chassis October 2011 Comments? infodev@avaya.com...
  • Page 55: Chapter 9: Translations Of Safety Messages

    Chapter 9: Translations of safety messages This section contains translations of precautionary notices that you must read and follow for safe operation of the Avaya Virtual Services Platform 9000. Class A device caution statement Caution: This device is a Class A product. Operation of this equipment in a residential area is likely to cause harmful interference, in which case users are required to take appropriate measures necessary to correct the interference at their own expense.
  • Page 56 Per evitare danni derivanti da scariche elettrostatiche, indossare sempre un polsino antistatico collegato a una presa di scarico elettrostatico (ESD) durante la manutenzione del prodotto. Accertarsi che il polsino sia a contatto con la pelle. Installation — Chassis October 2011 Comments? infodev@avaya.com...
  • Page 57 Laser fiber optic warning statement Warning: Risk of eye injury by laser Fiber optic equipment can emit laser or infrared light that can injure your eyes. Never look into an optical fiber or connector port. Always assume that fiber optic cables are connected to a light source. Warning: AVERTISSEMENT Risques de blessure oculaire par lumière laser...
  • Page 58 Warning: AVVISO Rischio di lesioni personali Per sollevare lo chassis VSP, sono necessarie tre persone. Per alleggerire lo chassis, rimuovere i moduli e gli alimentatori prima di sollevarlo. Installation — Chassis October 2011 Comments? infodev@avaya.com...
  • Page 59: Chapter 10: Customer Service

    Chapter 10: Customer service Visit the Avaya Web site to access the complete range of services and support that Avaya provides. Go www.avaya.com or go to one of the pages listed in the following sections. Navigation • Getting technical documentation on page 59 •...
  • Page 60: Getting Technical Support From The Avaya Web Site

    Customer service Getting technical support from the Avaya Web site The easiest and most effective way to get technical support for Avaya products is from the Avaya Technical Support Web site at www.avaya.com/support. Installation — Chassis October 2011 Comments? infodev@avaya.com...
  • Page 61: Index

    Installing the installation shelf ........9090SF module ............AC power supplies ............. LEDs ................Assemble and install cable management brackets ..Lift the chassis ............Avaya Virtual Services Platform 9000 chassis .. grounding ............. installing ............... power supplies ............power-up sequence ............ chassis ............

This manual is also suitable for:

Virtual services platform 9012

Table of Contents