Avaya Virtual Services Platform 9000 Installation Manual page 70

Hide thumbs Also See for Virtual Services Platform 9000:
Table of Contents

Advertisement

Virtual Services Platform 9012 chassis
Table 15: 9012 chassis shipping accessories
Check
Accessory
VSP 9012 chassis
Ten I/O and Control Processor (CP)
filler panels
Four Switch Fabric (SF) filler panels
Two Auxiliary card filler panels
Regulatory label
Two SF fan trays
Two IO fan trays
One DB9 to DB9 connector
One accessory kit
One cable manager assembly
One generic label accessory kit
Screws and hardware:
12 Phillips-head screws
12 clip nuts
4 Phillips-head screws
4 hex nuts
4 pan-head screws
Installation shelf
One left front cable management
bracket
Grounding kit hardware
The following figure illustrates the accessories in the chassis shipping container.
October 2015
Usage
Filler panels must be installed in unused slots.
Filler panels must be installed in unused slots.
Filler panels must be installed in unused slots.
The hardware required to mount the chassis in a rack
depends on your rack type.
Mount the chassis to a rack rail.
Use the clip nuts, if necessary.
Mount the installation shelf to a rack rail.
Install the cable management bracket.
Mount the Virtual Services Platform 9000 chassis in an
equipment rack.
Manage network interface cables.
Connects the chassis to the ground of the rack.
Installing the Avaya VSP 9000
Comments on this document? infodev@avaya.com
70

Advertisement

Table of Contents
loading

Table of Contents