Calibrate Your Nuvation Energy Bms - Nuvation Energy NUV300-BC-12 Product Manual

Low-voltage bms
Table of Contents

Advertisement

5.6. Calibrate your Nuvation Energy BMS

Before you start regular operation of your Nuvation Energy BMS, it is recommended that you
calibrate it for accurate usable capacity measurements. This calibration should be re-done if the Low-
Voltage BMS module or the current shunt is changed in the future.
1. Refer to
Section 7.9
measurements
2. Fully charge up the batteries to 100% State-of-Charge (as defined in the configuration file)
3. Discharge the batteries to 0% State-of-Charge (as defined in the configuration file)
4. Optionally, charge the batteries back up to 100% State-of-Charge
A power cycle during the State-of-Charge calibration steps will require the State-of-
Charge calibration to be redone from the beginning.
Document ID: NE-PM-002
for steps to calibrate the stack current, voltage, and temperature
59
Nuvation Energy Low-Voltage BMS - Product Manual
Rev 1.2, 2021-03-03
Curie Update 1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nuv300-bc-16Nuv100-ci-12-1Nuv100-ci-16-1

Table of Contents