stack_control.connect_delay
The delay between current limits engaging and the contactors connecting after a connect
request
This delay is important for systems using pre-charge
When pre-charge is used the delay must be a minimum of one second and is limited to 10
seconds maximum, otherwise the delay should be set to zero
stack_control.disconnect_delay
The delay between current limits disengaging and the contactors disconnecting after a
disconnect request
This delay is important to allow a PCS time to ramp down before the BMS opens the contactors
This delay should not be less than one second and is limited to 10 seconds maximum
The disconnect switching delay only applies to disconnect requests. Under a fault condition, the stack
is disconnected immediately.

7.6.2. Stack Current Limits

7.6.2.1. Maximum Operating Currents
The maximum continuous operating charge and discharge currents must be configured for current
limiting to function properly. These values correspond to the current limit values that will be used
during normal wide-open operation (i.e. no throttling).
stack_current_limit.max_charge_current
Magnitude of maximum continuous operating charge current
stack_current_limit.max_discharge_current
Magnitude of maximum continuous operating discharge current
The current limits given above are magnitudes only—i.e. both charge and discharge
current limits are positive.
7.6.2.2. Minimum Charge Current
The minimum charge current is the constant charging current that should be applied as the battery
reaches the end of its charge cycle. The BMS will ensure that the charge current limit does not fall
below this minimum value until the battery has reached its maximum charging voltage.
stack_current_limit.min_charge_current
Minimum charge current to be applied at the end of charge cycle
Set as per battery manufacturer recommendations (typically below C/20)
This setting must be configured in conjunction with the full thresholds defined by
example, the stack can be considered full once the current limit reaches the minimum charge current.
Document ID: NE-PM-002
Nuvation Energy Low-Voltage BMS - Product Manual
108
Stack
Capacity. For
Rev 1.2, 2021-03-03
Curie Update 1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nuv300-bc-16Nuv100-ci-12-1Nuv100-ci-16-1

Table of Contents