Sign In
Upload
Manuals
Brands
Nuvation Energy Manuals
Control Systems
NUVG5
Nuvation Energy NUVG5 Manuals
Manuals and User Guides for Nuvation Energy NUVG5. We have
1
Nuvation Energy NUVG5 manual available for free PDF download: Product Manual
Nuvation Energy NUVG5 Product Manual (97 pages)
G5 High-Voltage BMS
Brand:
Nuvation Energy
| Category:
Control Systems
| Size: 14.42 MB
Table of Contents
Table of Contents
2
Introduction
6
About this Manual
6
Product Overview
7
G5 Stack Switchgear
9
G5 Cell Interface
11
G5 BMS Software
12
Operator Interface
12
G5 BMS Firmware
12
Key Features
13
Functional Overview
14
Installation Instructions
16
Safety Instructions
16
G5 Cell Interface
17
Installation Overview
17
Mechanical Installation
18
Dimensions and Weight
18
Installation Location and Position
18
Mounting Instructions
19
Electrical Connections
20
Getting Started
20
Connect the Cell Voltage and Temperature Cable
20
Connect the Link Bus Cable
21
G5 Stack Switchgear
22
Installation Overview
22
Mechanical Installation
23
Dimensions and Weight
23
Installation Location and Position
24
Mounting Instructions
24
Electrical Connections
29
Getting Started
29
Ensure System Is De-Energized
30
Ground the G5 Stack Switchgear
30
Connect Power in and Fan Control
31
Connect Control to General Purpose Input/Output (GPIO) Cable
32
Connect Ethernet Cable to External Computer
32
Connect Link out Cable to G5 Cell Interface
33
Set the Config Switches
34
Connect Battery Stack and DC Bus
34
Energize G5 Stack Switchgear and Fans
36
G5 Operator Interface
37
Download and Install the G5 Operator Interface
37
Connect to the G5 Operator Interface
37
First Power-Up
40
Operating Instructions
41
Operating Limits
41
G5 Stack Switchgear
41
External Specifications
41
Electrical Characteristics
41
G5 Cell Interface
44
Electrical Characteristics
44
Maximum Stack Deployment
45
Environmental Conditions
45
Status Leds
46
G5 Stack Switchgear Status Leds
46
G5 Cell Interface Status Leds
47
Using the Operator Interface
48
The Dashboard Tab
48
Warnings and Faults
48
Stack Voltage
49
Stack Current
49
State-Of-Charge
49
Depth-Of-Discharge
50
Cell Voltage
50
Temperature
51
Nuvation Energy BMS Status
52
The Details Tab
55
Addressing
55
Battery
55
Safety
56
Cell Voltages
57
Thermistor Temperatures
58
Open Wire
58
Soc Calibration
59
The Menu Options
61
Registers
61
Service
61
Connection
64
Locking and Unlocking
64
About
65
The Status Banner
66
Service Lockout Indication
66
Self Check Indication
66
Communication Loss
66
Communication Protocols
67
G5 BMS Firmware Features
77
Instructions for Stack Servicing
85
Appendix A: Battery Topology Terminology
86
Appendix B: Best Practices
87
Excess Cable Management
87
Appendix C: Ordering Information
88
G5 Stack Switchgear
88
G5 Cell Interface
89
Appendix D: Mating Connectors
90
G5 Stack Switchgear Connectors
90
Power and Fan Connector
90
I/O Connector
90
Linkbus Connector
92
Ethernet Connector
92
Battery and DC Bus High Current Connectors
93
Earth Bonding Connector
93
G5 Cell Interface Connectors
94
Cell Voltage and Temperature Connector
94
Link in Connector
95
Link out Connector
96
Advertisement
Advertisement
Related Products
Nuvation Energy NUV300-BC-12
Nuvation Energy NUV300-BC-16
Nuvation Energy NUV100-CI-12-1
Nuvation Energy NUV100-CI-16-1
Nuvation Energy NUVSSG-1250-100
Nuvation Energy NUVSSG-1250-200
Nuvation Energy NUVSSG-1250-300
Nuvation Energy BMS NUVBCP-4S
Nuvation Energy BMS NUVBCP-32S
Nuvation Energy BMS NUVBCP-36S
Nuvation Energy Categories
Control Systems
Controller
Network Hardware
Test Equipment
Control Panel
More Nuvation Energy Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL