NEC Express5800 Series User Manual page 16

Hide thumbs Also See for Express5800 Series:
Table of Contents

Advertisement

power-on operation is done within the period of less than 60 seconds from the supply of power. After
making sure that the power is supplied to every CPU blade, turn on the power of each CPU blade by
pressing the POWER switch.
After turning off the power of a CPU blade once, turn on the power again after 30 seconds have
passed from the power-off.
Remove a CPU blade after turning off the power of the CPU blade.
Do not perform any of the following operation during POST (including similar operations from EM
card and external applications).
 Press the POWER switch of the CPU blade.
 Press the RESET switch of the CPU blade.
 Remove the CPU blade from the Blade Enclosure.
 Disconnect the power cord from the power unit of the Blade Enclosure.
● Hard disk drive
Confirm the slot to which the Hard Disk Drive is inserted. The slot for the Hard Disk Drive to be
connected to each CPU blade is defined previously.
16
Tips
Maintenance service
We offer periodic diagnosis and maintenance services by staff with expert
knowledge of the maintenance of this server.
We recommend that you make a periodic maintenance service contract with your
maintenance service company to keep your server in good condition.
Express5800/B120d, B110d User's Guide
Precautions for Use (Be Sure to Read)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Express5800/b120dExpress5800/b110dExpress5800 n8400-131fExpress5800 n8400-134fExpress5800 n8400-135fExpress5800 n8400-137f ... Show all

Table of Contents