Delivery Check; Preparation Of The Machine - HE-VA Triple-Tiller Operating Instructions Manual

Rigid: 3.0 - 3.5 (from machine no. 27710)
Hide thumbs Also See for Triple-Tiller:
Table of Contents

Advertisement

Preparation of the machine

Check :
 the machine for any damages.
 for transport damage to the paint.
 hydraulic hoses for cuts and other damage. Check that none of the other hydraulics components
were damages during transport.
 that the frame has not been damaged.
 that the transport wheels are secure and in good condition.
 air pressure level according to technical specifications.
 that all wearing points are intact.
 that all distance clips for depth adjustment are included.
 that all light systems are in working order (if any such system is mounted).
Check the torque:
 wheel bolts 386 NM
 mounting plate for towing eye
 6 pcs bolts 541 NM
Check machine functioning (tractor needed):
 raising – lowering – hydraulic unfolding
 spindle adjustable levelling discs / levelling tines
 spindle adjustable support wheels
 rollers / scrapers
Triple-Tiller

Delivery check

6
08-05-2013

Advertisement

Table of Contents
loading

Table of Contents