UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
Phillips
screwdriver
(M3/M4/M5/M6/
M8)
Table 6-1
tools required, see the corresponding component manuals. Prepare tools based on site
requirements.
6.1.3 Preparing Power Cables
● The UPS can generate large leakage currents. A circuit breaker equipped with a
● If the top cabling component and bottom cabling cabinet are not configured,
If the top cabling component and bottom cabling cabinet are not configured,
prepare wiring copper bars for mains input, bypass input, and output based on the
following drawings and current requirements.
Issue 03 (2021-04-22)
Insulated torque
wrench
(M6/M8/M12/
M16)
NO TE
lists only the common tools for installation and cable connection. For more dedicated
NO TICE
residual current device (RCD) is not recommended.
copper bars need to be prepared for the mains input, bypass input, and output,
which cannot be directly connected using cables.
Copyright © Huawei Technologies Co., Ltd.
Tools and Meters
Heat shrink
tubing
6 Installation
Insulated
adjustable wrench
67