Huawei UPS5000-H-1200 kVA User Manual page 115

Hide thumbs Also See for UPS5000-H-1200 kVA:
Table of Contents

Advertisement

UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
Figure 6-73 Installing anchor baffle plates
----End
Installation on Channel Steel
● Huawei does not provide channel steel or expansion bolts for securing channel
● Ensure that the surface of channel steel is level.
● The procedure for installation on channel steel is similar to that for installation
Figure 6-74 Recommended channel steel dimensions (unit: mm)
Issue 03 (2021-04-22)
NO TICE
steel. Customers need to purchase them by themselves.
on the floor except the following steps:
Determine the mounting holes for the cabinets based on the marking-off
template (for installation on channel steel).
Drill mounting holes on the channel steel using a hammer drill.
Use M12x60 bolts to secure the cabinets on the channel steel.
Copyright © Huawei Technologies Co., Ltd.
6 Installation
107

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ups5000-h-1600 kva

Table of Contents