UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
Figure 6-44 Drilling holes and installing expansion sleeves
(1) M12 bolt
(4) Expansion sleeve
Step 3 Remove the UPS cabinet side panels.
Step 4 Remove the front panel from the bottom cabling cabinet.
Step 5 Combine the bottom cabling cabinet.
Figure 6-45 Combining the bottom cabling cabinet
Step 6 Secure the cabinets.
Issue 03 (2021-04-22)
(2) Spring washer
(5) Expansion nut
Copyright © Huawei Technologies Co., Ltd.
6 Installation
(3) Flat washer
(6) Concrete floor
92