GE CT ProSpeed Series Installation Manual page 76

Table of Contents

Advertisement

GE MEDICAL SYSTEMS
REV 15
BRN
FUSE HOLDER
POWER
CABLE
6.
Cover replacement
a. Switch ON DC III breaker.
b. Install the DC III Rear cover.
c. Switch ON the OC breakers.
d. Install the OC front, rear and top covers.
DC
POWER SUPPLY
100VAC POINT
BNC CONNECTOR
NOISE
FILTER
LBLU
CONDUIT
BRACKET
BREAKER
GND
CONTROL
CABLE
CABLE
INSIDE OF DC III (TOP VIEW)
ILLUSTRATION 3–27
CT PROSPEED SERIES INSTALLATION
POWER CABLE
GND POINT
VIDEO AMP
VIDEO
GND CABLE
CABLE
GROUND POINT
3-38
2124011
REAR SIDE

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents