GE CT ProSpeed Series Installation Manual page 42

Table of Contents

Advertisement

GE MEDICAL SYSTEMS
REV 15
3–1–1 Setting Coupling Terminal for Input Voltage (continued)
6.
Remove the rear cover, after removing the fan connector (brown connector) and the ground cable.
See Illustration 3–1 (C).
a. Verify that the rear cover is installed in step, and that the fans' connector is properly connected before applying
power to PDU.
7.
Remove the right side cover, after removing the fan connector (brown connector) and the ground cable.
See Illustration 3–1 (D).
A. REMOVE FOUR(4) HOIST
RINGS.
Å Å Å Å Å Å
Å Å Å Å Å Å
Å Å Å Å Å Å
Å Å Å Å Å Å
Å Å Å Å Å Å
Å Å Å Å Å Å
Å Å Å Å Å Å
: FRAME GROUND POINT
FAN CONNECTOR
Å Å Å Å Å Å
Å Å Å Å Å Å
Å Å Å Å Å Å
B. REMOVE THE TOP
COVER.
GROUND CABLE
D. REMOVE THE RIGHT
SIDE COVER.
POWER DISTRIBUTION UNIT FRONT VIEW
ILLUSTRATION 3–1
3-4
CT PROSPEED SERIES INSTALLATION
Å Å Å Å Å
Å Å Å Å Å
Å Å Å Å Å
Å Å Å Å Å
: FRAME GROUND POINT
GROUND CABLE
FAN CONNECTOR
Å Å Å Å Å
Å Å Å Å Å
Å Å Å Å Å
C. REMOVE THE REAR
COVER.
: FRAME GROUND POINT
2124011

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents